Reduce Risk and Labor Costs by 50% with ComRent’s Load Banks

ComRent’s load solutions accurately test the functionality of power substations including delivery, protection mechanisms, monitoring devices, metering and PLC/HMI programming.

download icon large

Reduce your labor costs by up to 50% by eliminating reliance on the grid.

time icon large

No need to wait for substation completion and building construction – test today!

alert icon large

Reduce your risk & liability of equipment damage and mitigate risk of customer outages.

like icon large

Ensure compliance with environmental regulations (IEEE) and NERC and FERC audits.

gauge icon large

Test with accurate simulated load steps for faster validation of design specifications.

    OUR CLIENTS

    APPLICATION

    • Sub-Station Testing

      A power distribution company wanted support of the commissioning of a 100MVA substation with voltage levels that exceeded the design criteria. The goal was to prove the effectiveness of the Supervisory Control and Data Acquisition (SCADA) and relaying systems. ComRent provided a turnkey solution from products to engineering and project management support. The result was a successful verification of paralleling and breaker operation. SCADA and the protection relay systems were successfully tested without using the grid.