Southern California Edison completed construction of a new build 500/230kV substation to support multiple solar and wind farm projects in development in the area. The substation commissioning project was intended to help connect the First Solar Desert Sunlight Solar Farm, and future renewable-power projects, to the Southern California Edison transmission grid. The Utility required a load to allow testing and commissioning of the protection system for the new, high voltage substation. They needed a solution that would provide 14MW of load at 220kV.
The Utility hired Comrent to deliver a successful load bank solution. The team identified that there was another nearby substation perfectly positioned to aid with testing and commissioning. The Red Bluff substation is in an area defined by state and federal agencies as rich in solar-energy resources, where several renewable-power generation projects are in development and the company needed to test and commission both its Red Bluff and Colorado River Substations.
Coordinated with a team of ten vendors, Comrent engineered a custom load bank, High Voltage Transformer, and circuit breaker isolation system for its highest voltage test ever (15MW resistive load). Comrent supplied the right load testing equipment for both substation projects and completed the substation commissioning successfully.
Comrent provided a 220kV load bank system for testing prior to connecting the substations to the grid. The equipment list included:
In addition to the big iron, Comrent provided ancillary equipment for safe jobsite conditions:
Having met or exceeded all deadlines, Comrent safely executed all logistics and operations in the HV environment and successfully completed all required testing and commissioning. Southern California Edison successfully corrected settings and calibration without putting transmission assets at risk.
Do you have a question? Connect with one of our experts. Please fill out the form and a member of our team will contact you within one business day.
The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.
A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!
Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.
Do you have a question? Connect with one of our experts. Please fill out the form and a member of our team will contact you within one business day.